Function
Project Scope of Work
Located proximity 20 km to the east of the Gulf line and approximately 12 km Southwest of the existing Safaniyah GOSP-1 facility, the objective of this Budget Item is to provide water supply from three (3) sources; the existing Safaniyah GOSP-1, the new Zuluf AH Central Processing Facility (CPF), and Jaladi aquifer water for the purpose of treatment and injection. The facility will process 1,400MBCD of water for injection to cover the production forecast up to 2035; to ultimately maintain the existing Safaniyah Field’s Maximum Sustainable Capability (MSC). In addition, the scope will expand water facilities in Safaniyah GOSP-1 to accommodate the surplus produced water that exceeds the overall existing formation water system capacity up to year 2035
Company Information
Aramco is one of the world’s largest integrated energy and chemicals companies.
Aramco Europe is headquartered in The Hague with offices across the continent. For over 60 years we have supported Aramco with a wide range of activities from facilitating safe and reliable delivery of energy to customers around the globe to pushing for breakthroughs in research and innovation.
Our services include in-depth technology advice and support in established and emerging sectors of oil, gas and energy, as well as finance, HR, legal, PR and communications.
We work with the very best industry suppliers to drive our operations to secure our position as a world leader in energy and chemicals.
Job Purpose The Welding Engineer is responsible to review, assess and manage the scope of works relevant to the specialization of the allocated FEED/EPC package.
The Designated
Welding representative is the last line of engineering defence – review the equipment design / materials of construction / method of fabrication / material selection / service conditions / code compliance / constructability / Contractor and Vendor performance.
Note: The DWR functionally reports to the Saudi Aramco CSD (Consulting Services Department) Welding Group – and reports to the project for administrative purposes only. The DWR must ‘work with’ but be ‘independent of’ the project to avoid conflicts of interest.
Key Responsibilities and Duties
- Plan and prepare schedule for finishing work within deadlines.
- Ensure that the job progresses as per schedule.
- Review, participate, guide and manage the FEED/EPC contractor in developing the scope of works as defined in the various Work Entity Releases (WER’s).
- Provide technical support to the project management team and engage on any specialty services related to the discipline required activities (static equipment / piping / material selection / corrosion control / non-metallic / PMI).
- Resolve specialty related engineering issues by applying accepted principles, codes and standards.
Requirements Educational & Technical Requirements:
- Bachelor Degree in Engineering discipline
- 15 years of relevant experience in large to mega projects as specified by CSD welding group
- Thorough knowledge of engineering practices and economic principles, calculation methods, design details
- Good working knowledge of Aramco standards and procedures and International standards
- Good knowledge of English, both written and verbal
Competencies
- Plan & Organize
- Analyze & Solve problems
- Communicating openly & effectively
- Excellence/ Drive for results
- Safety
Offer Information For more information, please reach out to us at
[email protected]
Apply
📌 Welding Specialist – Milan (Milano)
🏢 Dovre Solutions
📍 Milano