14 set
|
Jinko Power
|
Bardi
pbYour Responsibilities /b /pullibGrid feasibility and strategy.
/bAssess grid capacity, voltage level, connection points, route options, network constraints, reinforcement needs and potential curtailment; recommend the most bankable connection strategy for each project.
/lilibConnection applications.
/bPrepare, submit and manage complete connection applications and supporting technical data to Terna and the relevant distribution system operators (DSOs).
/lilibItalian connection process.
/bManage the full procedural path, including STMG review and acceptance, authorisation-status updates, POD and STMD steps where applicable, connection contracts, fees, deadlines and operator deliverables.
/lilibTSO/DSO interface.
/bAct as the day-to-day technical contact with Terna, E-Distribuzione and other DSOs; lead technical meetings, clarification rounds and follow-up actions.
/lilibGrid studies.
/bDefine scopes of work and coordinate internal specialists and external consultants for load-flow, short-circuit, reactive-power, protection, harmonic and dynamic studies; critically review assumptions, results and mitigation actions.
/lilibTechnical compliance.
/bEnsure project compliance with the applicable TICA framework, Terna Grid Code, CEI 0-16, ARERA requirements and other relevant Italian and European grid-connection rules.
/lilibConnection design review.
/bReview single-line diagrams and the concept/design basis for MV/HV connection assets, including substations, transformers, underground/overhead lines, protection and control, metering, telecontrol/SCADA, plant controllers and reactive-power systems.
/lilibSchedule, cost and risk.
/bMaintain connection schedules, budgets, risk registers and decision logs; quantify impacts of grid works, network reinforcements, delays and operating constraints, and propose practical mitigation.
/lilibCross-functional delivery.
/bCoordinate with project development, permitting, land, legal,
investment, finance, procurement, engineering and construction teams so that connection facilities, cable routes, substation land and authorisations remain aligned.
/lilibTransactions and investment decisions.
/bProvide grid input to investment approval, project valuation, technical due diligence, acquisition, financing and divestment processes; clearly flag conditions, liabilities and residual risks.
/lilibConstruction to COD.
/bPrepare a disciplined handover to engineering and EPC teams, support detailed design and construction interfaces, and coordinate grid-compliance documentation, testing, energisation and GAUDÌ-related activities through COD.
/lilibReporting and document control.
/bMaintain accurate trackers, correspondence, portal records and technical files, and provide concise portfolio reporting to the Italy development leadership.
/li /ulpbOur Requirements /b /pullibEducation.
/bBachelor's or Master's degree in Electrical Engineering, Power Systems, Energy Engineering or a closely related discipline.
/lilibExperience.
/bTypically 5-8 years of relevant grid-connection, power-systems or renewable-energy project experience, including strong hands-on experience in the Italian market.
/lilibProject track record.
/bDemonstrated responsibility for utility-scale renewable or storage projects in Italy, with direct involvement from grid screening/application through an advanced development, construction or energisation milestone.
/lilibItalian market knowledge.
/bPractical knowledge of Terna and DSO connection processes, STMG/STMD documentation, TICA, the Terna Grid Code, CEI 0-16 and the relevant MyTerna/GAUDÌ workflows.
/lilibTechnical capability.
/bSound understanding of MV/HV systems, substations, transformers, cable/line connections, protection and control, reactive power, metering, SCADA/telecontrol and grid-compliance studies.
/lilibTechnical review.
/bAbility to review single-line diagrams, grid studies, connection offers, design packages and consultant deliverables, challenge weak assumptions and translate findings into clear project decisions.
/lilibCommercial and project discipline.
/bAbility to manage consultants, budgets, schedules, contractual/technical interfaces and multiple projects concurrently, with strong ownership and attention to deadlines.
/lilibStakeholder management.
/bConfident, constructive communicator able to work independently with network operators, authorities, consultants, EPC contractors and multicultural internal teams.
/lilibLanguages.
/bFluent Italian and professional English, both written and spoken.
/lilibTools.
/bStrong Microsoft Office skills.
Familiarity with AutoCAD and GIS is preferred; exposure to DIgSILENT PowerFactory, PSS®E or equivalent power-system software is an advantage, not a prerequisite.
/lilibMobility.
/bWillingness to travel regularly within Italy; a valid driving licence is required.
/li /ulpbPreferred Background /b /pullibTechnology breadth.
/bExperience across both utility-scale solar PV and BESS or hybrid projects.
/lilibOperator exposure.
/bDirect experience with both Terna-connected projects and projects connected through one or more Italian DSOs.
/lilibLifecycle exposure.
/bExperience supporting project acquisition/due diligence and at least one project through detailed design, testing or energisation.
/li /ulpbr/p
📌 Grid Connection, Manager (Bardi)
🏢 Jinko Power
📍 Bardi